Very Early Smoke Detection Aparatus - VESDA
Implement an early warning system, eliminate plant failure or damage and enhance site availability
To proactively enhance safety systems across the site by implementing a VESDA early warning system
Proactively identified the opportunity to implement an early warning system. Pitched proposal and researched possible solutions. Identified best product and implemented system in one unit alongside supplier, with sole responsibility for electrical installation. Evaluated results over a 6 month period and ultimately rolled out installation across all site units
System is online and integrated seamlessly into running of site, reducing lost time incidents and picking up issues early
Project:
Objective:
Proposal:
Process:
Outcome:
Variable Speed Drive for Gas Compressor
To replace existing ineffective equipment with a 5.5 megawatt variable speed drive
To identify and procure a replacement system as existing solution was no longer supported by the supplier making replacement parts unavailable
Supported client through initial tendering process, making recommendations and ultimately selecting a Siemens solution. Worked alongside client and supplier to remove existing system and integrate the new drive into the facility. Developed a plan, drawing and Scope of Works to take compressor offline whilst new drive was installed. Worked alongside Siemens through commissioning and verified checks on emergency shutdown and fire and gas systems.
Successfully installed and seamlessly integrated, replacement parts readily available and efficiency enhanced